Inchgarth Cofferdam

Inchgarth Pumping Station

Client: Balfour Beatty Civil Engineering

Scope of work: LB installed a temporary cofferdam to assist Balfour Beatty to access the main raw water intakes within the floor of the River Dee to allow them to carry out upgrading works to the intake screens.

The sheet pile installation work were carried out afloat from a modular barge working within the River Dee under stringent environmental conditions.

Hamilton Technology Park

Hamilton Technology Park

Client: ROK then Balfour Beatty Construction

Scope of work: Permanent Ground Retention installed at Hamilton Technology Park initially for ROK then for Balfour Beatty Construction.

Griffin Wind Farm

Griffin Wind Farm

Client: Luddon Construction

Scope of work: Luddon Construction – Griffin Wind Farm

Installation of sheet piles using side grip
vibrating hammer adjacent to railway bridge

Page 3 of 7 pages  <  1 2 3 4 5 >  Last »